Engineering Active Projects

Walton County has adopted a Five Year Work Plan provided by the Engineering and Public Works Department. The most current and previous work plans are available here. 

  1. Design
  2. Construction / CEI
  3. Complete

Design projects are considered to be in the conceptual, design,  or permitting phases. This task could be handled by a continuing consultant working under Walton County's direction or may be performed by Engineering and/or Environmental Department staff. 

Substantially Complete indicates that final plans and an opinion of probable cost have been completed.  On-going project efforts differ for every project but typically include maintaining permits, coordinating mitigation with appropriate agencies, coordinating with impacted utility providers, seeking right-of-way acquisition and/or construction easements and identifying funding sources for applicable projects. 

In ProgressSubstantially Complete with On-Going Project Efforts
Ghentsville FRDAP PierAllen Loop Drainage Improvements
Walton County Pedestrian Master Plan13th Street Roadway & Drainage Improvements
CR 280 Bob Sikes Roadway ImprovementsChoctaw Beach Park Access Improvements
Driftwood & US 98 Intersection SignalizationCR 393/CR 30A Signalization Improvements
Holiday Shores Pedestrian & Drainage Improvements PH 2CR 395/30A Roadway & Pedestrian Improvements
Mack Bayou & Sandestin Lane Connector RoadFox Lake Drainage Improvements
ITS Master Plan & Traffic Signal System AnalysisGolf Garden (Paradise Park) Irrigation & Landscaping Plan
Old Blue Mountain Road (CR 83N)Helen McCall Park Expansion & Parking Improvements
Old Town of Santa Rosa Regional Stormwater Management Facility PH 2Poinciana Boulevard Roadway, Drainage, & Pedestrian Improvements
South Walton Multi Use Trail PH 2Madge & Sally Lane roadway & Drainage Improvements
Walton Way & US 98 Intersection SignalizationNellie Drive Connector Road
Mossy Head Health DepartmentNorwood, Open Gulf, & Sandtrap Drainage Improvements
Morrison Springs ModificationsHewett Bayou Connector Road
CR 395 and US 98 Intersection Improvements
Rock Hill Road Widening & Resurfacing PH 2
CR 280 A & 280E BridgesRock Hill Road Widening & Resurfacing PH 3
South Walton Health DepartmentSouth Orange Street Sidewalk
South Walton Senior CenterTeelinville Dam Improvements
Mossy Head Industrial Park Railroad Crossing/Intersection ImprovementParadise Park Improvements
Padgett Park Splash PadCR 1087 & US Hwy 90 Intersection SB Right Turn Lane
Cessna Boat Ramp Rehabilitation
Hinote Road & US 90 Intersection SB Right Turn Lane

CR 283 S Roadway Resurfacing Plans

Walton Magnolia Lane & Park Place Drainage Improvements
Old Town Santa Rosa Regional Stormwater Management Facility PH 1

Blue Gulf Resort Drainage Improvements

CR 30A/ S Watersound