Walton County has adopted a Five Year Work Plan provided by the Engineering and Public Works Department. The most current and previous work plans are available here.
Design projects are considered to be in the conceptual, design, or permitting phases. This task could be handled by a continuing consultant working under Walton County's direction or may be performed by Engineering and/or Environmental Department staff.
Substantially Complete indicates that final plans and an opinion of probable cost have been completed. On-going project efforts differ for every project but typically include maintaining permits, coordinating mitigation with appropriate agencies, coordinating with impacted utility providers, seeking right-of-way acquisition and/or construction easements and identifying funding sources for applicable projects.
| In Progress | Substantially Complete with On-Going Project Efforts |
|---|---|
| Ghentsville FRDAP Pier | Allen Loop Drainage Improvements |
| Walton County Pedestrian Master Plan | 13th Street Roadway & Drainage Improvements |
| CR 280 Bob Sikes Roadway Improvements | Choctaw Beach Park Access Improvements |
| Driftwood & US 98 Intersection Signalization | CR 393/CR 30A Signalization Improvements |
| Holiday Shores Pedestrian & Drainage Improvements PH 2 | CR 395/30A Roadway & Pedestrian Improvements |
| Mack Bayou & Sandestin Lane Connector Road | Fox Lake Drainage Improvements |
| ITS Master Plan & Traffic Signal System Analysis | Golf Garden (Paradise Park) Irrigation & Landscaping Plan |
| Old Blue Mountain Road (CR 83N) | Helen McCall Park Expansion & Parking Improvements |
| Old Town of Santa Rosa Regional Stormwater Management Facility PH 2 | Poinciana Boulevard Roadway, Drainage, & Pedestrian Improvements |
| South Walton Multi Use Trail PH 2 | Madge & Sally Lane roadway & Drainage Improvements |
| Walton Way & US 98 Intersection Signalization | Nellie Drive Connector Road |
| Mossy Head Health Department | Norwood, Open Gulf, & Sandtrap Drainage Improvements |
| Morrison Springs Modifications | Hewett Bayou Connector Road |
| CR 395 and US 98 Intersection Improvements | Rock Hill Road Widening & Resurfacing PH 2 |
| CR 280 A & 280E Bridges | Rock Hill Road Widening & Resurfacing PH 3 |
| South Walton Health Department | South Orange Street Sidewalk |
| South Walton Senior Center | Teelinville Dam Improvements |
| Mossy Head Industrial Park Railroad Crossing/Intersection Improvement | Paradise Park Improvements |
| Padgett Park Splash Pad | CR 1087 & US Hwy 90 Intersection SB Right Turn Lane |
| Cessna Boat Ramp Rehabilitation | Hinote Road & US 90 Intersection SB Right Turn Lane |
| CR 283 S Roadway Resurfacing Plans | |
| Walton Magnolia Lane & Park Place Drainage Improvements Old Town Santa Rosa Regional Stormwater Management Facility PH 1 | |
| Blue Gulf Resort Drainage Improvements | |
| CR 30A/ S Watersound | |
Construction is the phase where projects—like roads, bridges, and sidewalks—are under construction with In-House crews or are outsourced to General Contractors. Walton County construction projects are built based on funding source requirements and In-House crew availability.
Construction Engineering and Inspection (CEI) is the team that oversees the construction work to make sure everything is built safely, correctly, and according to standards. They help keep projects on time, on budget, and up to quality.
To view a project flyer for construction projects currently in progress, click a project title below.
| Construction In Progress | |
|---|---|
| CR 395 N Roadway & Multi-Use Path | Signalization for US HWY 98 at Church St and Moll Drive |
| CR 1883 Roadway Improvements PH I | DeFuniak Street Improvements |
| Eagle Springs Golf Course Maintenance Building | Glendale Fire Station |
| SR 20 and CR 83A W (W Bay Loop) Intersection Improvements & Signalization | CR 30A Drainage & Multi-Use Path Improvements - CR 395 to Pelayo Drive (Phase I) |
| Beaver Dam Pier | Holiday Shores Pedestrian and Drainage Improvements PH IB |
| CR 393 North Drainage and Pedestrian Improvements | Teelinville Dam West |
| Low Speed Vehicle Pull Over Areas | Paradise Park Improvements |
| Paxton Health Department | Paxton Senior Center |
| Ghentsville Pier | |
| Driftwood & Ellis Roadway, Drainage, & Pedestrian Improvements | |
This Completed list of projects refers to the projects having finished construction and available for use by the general public or staff. Administrative close out for projects funded by grants may be ongoing per grant closeout requirements.
| Completed Projects | ||
|---|---|---|
| CR 30A. / S. Watersound Parkway SB Right Turn Lane | Rock Hill Road Widening & Resurfacing PH I | Walton County Building & Training Facility |
| Holiday Shores PH IA Pedestrian and Drainage Improvements | 20th St. Sidewalk PH I | Greenbriar Lane Drainage |
| CR 183 South Cross Drain Replace | Walton Sports Complex - Outdoor Fitness Park | South Walton Dog Park Improvements PH I |
| South Walton Multi Use Trails - Mack Bayou Roadway and Pedestrian Improvements PH I | South Walton Sports Complex Shade Structure | Hinote Road & US Hwy 90 Intersection SB Right Turn Lane |